Forty-Four Risk PMForty-Four Risk PM
  • All products
  • Men
  • Women
  • Home & Living
  • Accessories
  • Kids
  • Privacy policy
  • Terms & conditions
  • visa card type accepted here
  • mastercard card type accepted here
  • amex card type accepted here
  • dinners-club card type accepted here
  • apple-pay card type accepted here
  • google-pay card type accepted here
Powered by Printify
Forty-Four Risk PMForty-Four Risk PM
  • All products
  • Men
  • Women
  • Home & Living
  • Accessories
  • Kids
  • All products
  • Men
  • Women
  • Home & Living
  • Accessories
  • Kids
"Risk Register? More Like Pot of Gold" – Project Manager’s T-Shirt product thumbnail image
"Risk Register? More Like Pot of Gold" – Project Manager’s T-Shirt product thumbnail image
"Risk Register? More Like Pot of Gold" – Project Manager’s T-Shirt product thumbnail image
"Risk Register? More Like Pot of Gold" – Project Manager’s T-Shirt product thumbnail image

"Risk Register? More Like Pot of Gold" – Project Manager’s T-Shirt

Facebook
Twitter

"Risk Register? More Like Pot of Gold" – Project Manager’s T-Shirt

Color:Irish Green
Size:L
Size guide

$22.99

30 days return policy. See details
  • visa card type accepted here
  • mastercard card type accepted here
  • amex card type accepted here
  • dinners-club card type accepted here
  • apple-pay card type accepted here
  • google-pay card type accepted here
Color:Irish Green
Size:L
Size guide
Quantity:1
30 days return policy. See details
  • visa card type accepted here
  • mastercard card type accepted here
  • amex card type accepted here
  • dinners-club card type accepted here
  • apple-pay card type accepted here
  • google-pay card type accepted here
Quantity:1

About product

Without side seams

Without side seams

Knit in one piece using tubular knit, it reduces fabric waste and makes the garment more attractive

Ribbed knit with seam

Ribbed knit with seam

Ribbed knit makes the collar highly elastic and helps retain its shape

Shoulder tape

Shoulder tape

Twill tape covers the shoulder seams to stabilize the back of the garment and prevent stretching

Fabric

Fabric

Made from specially spun fibers that make very durable and smooth fabric that is perfect for printing. The "Natural" color is made with unprocessed cotton, which results in small black flecks throughout the fabric.

Age restrictions

Age restrictions

For adults

Warranty

Warranty

EU warranty - 2 years

Other compliance information

Other compliance information

Meets the flammability, lead, cadmium, phthalates and formaldehyde level requirements.

Country of origin

Country of origin

Made in Bangladesh

DTF sleeve prints

DTF sleeve prints

The sleeve prints offered by Print Clever are printed using Direct-to-Film (DTF) print method, while the rest of the prints are done with the Direct-to-Garment method

DTF inner neck labels

DTF inner neck labels

The inner neck labels are printed using the Direct-to-Film (DTF) print method, while the rest of the prints are done with the Direct-to-Garment (DTG) method.

Care set iconCare set iconCare set iconCare set iconCare set icon

Machine wash: cold (max 30C or 90F), with similar colors; Do not bleach; Tumble dry: low heat; Do not dryclean; Iron, steam or dry: low heat.

Accurate shipping options will be available in checkout after entering your full address.

standard
Cost

from USD 4.75

Delivering to

United States

Local delivery

2-5 business days

economy
Cost

from USD 4.29

Delivering to

United States

Local delivery

4-8 business days

Any goods purchased can only be returned in accordance with the Terms and Conditions and Returns Policy.

We want to make sure that you are satisfied with your order and we are committed to making things right in case of any issues. We will provide a solution in cases of any defects if you contact us within 30 days of receiving your order.

See terms and conditions
EU representative: Forty-Four Risk PM, LLC, [email protected], Blind Oak Circle, St Augustine, FL, 32095, US Product information: Gildan 64000, 2 year warranty in EU and Northern Ireland as per Directive 1999/44/EC Warnings, Hazard: For adults, Made in Bangladesh Care instructions: Machine wash: cold (max 30C or 90F), with similar colors , Do not bleach, Tumble dry: low heat, Iron, steam or dry: low heat, Do not dryclean
Report this product
Forty-Four Risk PMForty-Four Risk PM
  • All products
  • Men
  • Women
  • Home & Living
  • Accessories
  • Kids
Privacy policy Terms & conditions
  • visa card type accepted here
  • mastercard card type accepted here
  • amex card type accepted here
  • dinners-club card type accepted here
  • apple-pay card type accepted here
  • google-pay card type accepted here
Powered by Printify